Yulisna Anggi, yulisna and Ahmad Herison, ahmad ANALISA PERCEPATAN PROYEK METODE CRASH PROGRAM STUDI KASUS PROYEK PEMBANGUNAN GEDUNG BARU RS.IMANUEL WAY HALIM BANDAR LAMPUNG. ANALISA PERCEPATAN PROYEK METODE CRASH PROGRAM STUDI KASUS PROYEK PEMBANGUNAN GEDUNG BARU RS.IMANUEL WAY HALIM BANDAR LAMPUNG. (Submitted)

[img]
Preview
Text
Gmail - [JATS] Submission Acknowledgement.pdf

Download (68kB) | Preview

Abstract

Building construction work in Indonesia is endless, one of which is a hospital. Hospital is a health service institution that carries out complete individual health services that provide inpatient, outpatient and emergency services. The aim is to analyze the time and cost of accelerating work due to delays in development with the crash program method. The method used is a program crash. The crash program is a way to accelerate the estimated costs needed to reduce work time on critical paths. The calculation starts with searching for the critical path then crashing to get the cost slope. During the construction project, there are some obstacles that are often experienced and can cause delays. According to Perpres No. 54 of 2010, the delay can be subject to a fine of 1/1000 of the contract price. Delays can be overcome by accelerating job scheduling so that the specified time target can be achieved. The conclusion is that work can be accelerated using additional workforce and additional schedules and the normal duration for the 5th-floor structure to the Roof Level Floor (RL Floor) is 203 days, at a cost of Rp. 36,718,664,136.

Item Type: Article
Uncontrolled Keywords: proyek, penjadwalan, keterlambatan, crash program, waktu dan biayaoptimal
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik (FT) > Prodi Teknik Sipil
Depositing User: AHMAD HERI
Date Deposited: 02 May 2019 04:07
Last Modified: 02 May 2019 04:07
URI: http://repository.lppm.unila.ac.id/id/eprint/11441

Actions (login required)

View Item View Item